Wind and Snow Load: The Three Numbers Buyers Forget to Send

Every quotation assumes a load case, and when the buyer does not supply one, the factory assumes a mild one. That assumption travels with the drawing, the section and the anchor specification, and it is invisible until the first storm that matters.

Wind and Snow Load: The Three Numbers Buyers Forget to Send

One: the wind speed for the site

Not the country average, the site figure. Coastal, ridge-top, corner-plot and high-rise balcony sites all carry more wind than the inland averages, and a structure with a large open roof catches it. State the design wind speed your engineer expects, or the local code reference, and the section follows.

Two: the snow load, if the site has winter

Snow load is not one number either: ground snow load, exposure, roof pitch and whether the roof sheds or holds all interact. A pitched louvered roof sheds more than a flat canopy over a carport, which is why the same span gives different sections in different regions.

Three: the base you are fixing to

Concrete slab, footing, paving on sand, timber deck, or a rooftop with a membrane. The anchor type and the base plate size change with the substrate, and the number of anchors follows the uplift load. A frame designed for concrete, installed on pavers, is not the same structure in a wind.

How the numbers change the frame

The three numbers rarely change the blade; they change the beam, the post and the anchors. Higher wind means a deeper beam for the same bay, or a smaller bay for the same beam. A heavier snow case means more blades held closed and a load path that does not rely on the operator remembering to close the roof before a storm.

That is the part buyers miss when they compare quotations: two prices for a three by four metre bay can differ by a third, and the difference is not necessarily margin. It is often a beam depth, a post wall thickness, a base plate size and an anchor count, none of which appear on a photograph of a finished terrace.

Exposure is not only wind speed

Two sites with the same design wind speed behave differently if one is a sheltered courtyard and the other is the seventh floor of a building with a corner open to the sea. Terrain category, building height and the presence of surrounding structures all act on the same structure, and the local code usually handles that through an exposure coefficient rather than a second wind speed.

This is why a supplier asking for “wind speed” is not being difficult. The useful answer is a short paragraph plus a reference: design wind speed, terrain or exposure class, height of the installation above ground, and the code the local engineer is working to. Four lines, and the section is no longer a guess.

What the factory needs in writing

Write the numbers into the enquiry, not into a phone call. Load requirements that arrive by message tend to arrive one at a time, and the quotation is usually sent before the third one appears. A single line in the email — design wind speed, ground snow load if any, substrate, anchor preference — is enough to price the right frame and to put the assumption on the drawing where the installer will see it.

What happens without them

The factory quotes a standard section, the install goes to plan, and the structure performs until the one event it was never sized for. Then the conversation is about warranty rather than engineering, which is the wrong conversation.

Send the three numbers with the drawing. It costs nothing at quotation stage and it decides the section, the anchors and whether the proposal is actually buildable on your site.

The question to ask about the drawing

When the proposal comes back, ask one question: which line on this drawing tells my installer what the structure was designed for? A good drawing states the load assumption in the notes, next to the anchor schedule, where the person drilling the base plate will read it. If the assumption is nowhere on the sheet, it is in an email nobody takes to site.

For the buyer that single question separates a quotation from a design: it shows whether the numbers were used or merely received.

One page, kept with the order

The three numbers should end up on one page that survives the whole project: the enquiry, the drawing notes, the anchor schedule and the handover. Buyers who keep that page can answer a question about their own structure years later without asking the supplier to search an archive, and suppliers who receive it quote the same frame twice rather than pricing it again from scratch.