How to Read a Shop Drawing Before You Approve It

Once you approve the shop drawing, material gets cut. That makes the approval a commercial decision, not a formality, and a drawing is only useful if someone reads the numbers on it rather than glancing at the picture.

How to Read a Shop Drawing Before You Approve It

Dimensions against the site

Check the overall width and depth against your own site measurement, then check the clear internal dimension, because that is the number your customer will measure when the structure is up. A 20 mm discrepancy is invisible on a drawing and obvious on a finished terrace.

Post centres and the base detail

Post centres should be dimensioned from a fixed corner, not from both ends, so the tolerance lands in one place instead of two. The base detail should show the anchor type, the bolt spacing and the substrate it assumes, since a base plate drawn for concrete behaves badly on pavers.

Heights, falls and the door line

The drawing should carry the height at the wall, the height at the posts, and the fall across the roof. On a wall-mounted structure these three numbers decide whether the roof clears the door head and whether water runs away from the house.

Profile callouts and thickness

Every member should be called out with its section and wall thickness. If a drawing says “beam 150 series” without a thickness, the factory will choose one, and it will not be the heavier one.

Glass, sheet and infill

Material, thickness and position in the assembly. On glazed units also check the edge clearance and the drainage path at the sill, which is where a beautifully detailed frame still leaks.

Bill of materials and packing

Count the pieces: how many beams, how many blades, how many posts, and does the count match the plan. Then check the packing note, because the way a set is bundled decides how it arrives.

The three numbers that cause the most rework

In practice, most of the problems that reach a factory floor come from three numbers rather than from the general shape of the structure. The first is the wall height, which is often taken from a rough site photo and turns out to be measured above a step rather than above the finished floor. The second is the door swing, which is not on the drawing because nobody thought to draw the door. The third is the position of the drain, which decides where the low end of the roof has to be and therefore which post is the drain post.

Each of these is cheap to fix on a sheet and expensive to fix in metal. A drawing that shows the wall, the door and the drain is a drawing that has already answered them.

What to check on the second revision

The second round is where mistakes hide, because a revised sheet looks approved. Compare it against the first revision rather than reading it fresh: check that the dimension you queried has changed and nothing else has moved with it. Beam thickness changed from one size to another often drags the post centres and the fascia depth along with it, and that is the revision where a bay quietly becomes 60 mm narrower.

Keep the revision number in the email subject and keep the approved sheet somewhere the installer will find it. A crew working from a superseded drawing is not a crew making a mistake; it is a crew following the paper it was given.

Mark up the drawing, send the questions in one message, and get a revised sheet back. Two rounds of that is normal; approving without reading it is not.

Approval is a date, not a signature

The approval sets the clock: lead time starts from the approved drawing, not from the deposit. That means the sheet someone signs in a hurry is the sheet the factory cuts to, and any delay in reading it is delay in the whole programme. Two days spent checking dimensions costs two days; a dimension found on site costs the crate and the crew.

It also means the drawing should arrive with a place to sign and a date, and the reply should be one email that lists the answers rather than a thread spread across messages. Factories can only cut to the last written version they have.

A last check before the pen comes out: does the drawing show what is excluded? Balustrades, screens, lighting, motors, gutters and downpipes are all legitimate exclusions, and each of them costs money later. An exclusions note is not a weakness in a drawing; it is the part that keeps the approval honest.