We are the factory, not the middleman.
Our plant sits in Foshan, Guangdong — the cluster that supplies most of the outdoor aluminium sold into North America.
Shop drawings, cutting, assembly and packing all happen under one roof, which is the only reason a drawing can be quoted by the people who will actually cut the profiles.
If a detail on your drawing cannot be made, you hear it from us before the order, not after the container arrives.
Registered as Foshan Feifan Outdoor Aluminium Co., Ltd. — Foshan, Guangdong, China. Phone: +86 136 9011 3295.
6 yrs
1,600 m²
30+
20+
Inside the plant
Four passes under one roof — coating is the one step we send out, to a finishing shop working to the colour and film thickness written into our order, and checked back in before assembly.
Design
A sketch, a CAD file or a photo with sizes is turned into a shop drawing — sections, post spacing and fixing points named, missing dimensions asked for rather than guessed.
Cutting & machining
Every length comes off the cut list, and the first piece is measured against the shop drawing before the run continues.
Assembly
Frames are assembled once in the plant, not on site, and marked as they go — so a bracket that will not close, or a post that runs out of level, is found here and not on your scaffold.
Packing
Bundles are counted, marked and loaded against the packing list, with photographs taken before the doors close.
How quality is checked
Three points where a part can still be stopped. Once the container has gone, none of them can be reopened.
01 · Incoming
Before anything is cut
- Alloy grade and temper matched to the order before the bundle goes to the saw
- Wall thickness measured on arrival, not taken on trust from the mill’s paperwork
- Coated parts checked back in from the finishing shop — colour and film thickness against the order
02 · In process
While the job is running
- The first piece is measured against the shop drawing, and the run waits until it matches
- Cut list reconciled line by line with the drawing before the profiles are cut
- Post spacing and fixing points checked with the frame still on the bench — where a change costs minutes, not a container
03 · Before dispatch
Before the doors close
- Every bundle counted, tagged and ticked against the packing list
- One frame from each run dry-assembled, so a bracket that will not close shows up in Foshan
- Each crate photographed before it is closed, and the images filed with the shipping documents
How a job runs
Six steps from your drawing to a packed container — and the same people answer at every one of them.
-
01
Discuss the Details
You send a sketch, a CAD file or a photo with sizes. Missing dimensions are asked for, not guessed.
-
02
Confirm the Order
Priced against the drawing. Nothing is cut until you sign the shop drawing.
-
03
Manufacturing
Cut, assembled and packed under one roof. Coating is sent out to our spec and checked back in on return.
-
04
Packing & Crating
Counted, marked and crated in timber. Photographed against the packing list before the lid goes on.
-
05
Shipping
Loaded, lashed and documented. The packing list travels with the crate.
-
06
Delivery & Sign-off
Ships with the shop drawings and connection details. Check against the list, then sign off.
