Why we ask for a dimensioned drawing before anything is cut

A dimensioned drawing is not paperwork. It is the only place where the thing you are imagining and the thing we are cutting become the same object. Everything after it — extrusion, powder coating, packing, freight, installation — is irreversible.

What “dimensioned” actually means

Not a sketch with two arrows. A drawing that can be cut from without a phone call:

  • Overall width and depth of the footprint, to the millimetre.
  • Height, and what that height is measured to — top of beam, underside of beam, or top of post. These differ by 150–200 mm and are a common source of argument on site.
  • Post positions, not just post count. A 4 m opening with two posts has a different bay split than one with three.
  • Beam orientation — the 150×80 mm main beam reads differently when it runs long or short.
  • Roof type and fall direction, so the gutter lands where drainage exists.
  • Where the structure meets anything — wall, fence, existing paving edge, retaining wall.

Why we insist on it before cutting

Three reasons, all of them money:

1. Aluminium cannot be adjusted back

Timber can be trimmed, re-drilled, re-fixed. A powder-coated aluminium frame that is 40 mm too wide is scrap, or a very expensive re-make. There is no on-site fix that looks acceptable, because every fix shows in the coating.

2. The interface details decide the installation

How the post base meets the paving, how the roof edge closes at the wall, how a screen returns at a corner — none of these are visible in a photograph and all of them are determined by dimensions. Get them wrong and the installer discovers it on day one, at which point the only options are waiting or improvising.

3. Freight and packing follow the drawing

Long beams ship as long beams. If a 6 m run is drawn as one piece it must travel as one piece, which decides crate length, container loading, and whether the last mile needs a crane. A drawing that assumes a split beam is a different shipping plan entirely.

The dimensions people most often get wrong

Item Common error Consequence
Height reference “2.5 m” without saying what it measures Structure 200 mm off expectation
Opening width Measured between wall faces instead of finished faces Frame will not fit, or fits with a gap that needs a cover trim
Post centres Given as equal spacing, not actual positions Bay split differs from the design intent
Roof fall Assumed, not stated Water drains to the wrong side, or onto the house
Ground level Assumed flat Posts float or need re-cutting on site

What a good drawing submission looks like

In practice, most of our customers send one of two things: a photo with a tape measure in frame, or a simple CAD/PDF plan. Both work, provided the numbers are on them. What we cannot use is a rendering or a Pinterest image with no dimensions — those are mood, not measurements.

If you are measuring on site, note these four things and photograph them:

  • The full width and depth at ground level, measured twice.
  • The height you want, and what it is measured to.
  • Where water should go.
  • What the structure touches — wall, slab edge, fence line.

How the loop works

Drawing in, questions back, drawing confirmed, then production. The questions are usually two or three, and they exist because a dimension is ambiguous, not because we are being difficult. Answering them takes a day; a re-make takes weeks and a second freight bill.

Once the drawing is signed off, production normally runs one to three weeks. That clock starts at confirmation — not at the first enquiry, and not at the first sketch.

The habit worth building

Treat the drawing as the product’s first deliverable. If it is right, the rest is logistics. If it is vague, everything downstream absorbs the ambiguity: the cut list, the coating batch, the crate, the installer, and eventually the customer’s patience.

What we send back

A dimensioned drawing is not a one-way document. Once the dimensions are confirmed, we return a shop drawing: the members called out with their sections, the post centres dimensioned from one corner, the base detail with the anchor type, and the fall direction with the drain post marked. That sheet is what the factory cuts to and what the installer reads, so it is worth the hour it takes to check before approving it.

The useful habit is to compare the returned sheet against your own site measurement in two places: the clear internal dimension, which is what the customer will measure once it is standing, and the height at the wall, which decides whether the roof clears the door head. Get those two right and the rest follows.

When the site is not yet built

Drawings are often needed before the paving exists, and that is fine as long as the numbers come from the design rather than from a guess. Send the architect’s plan, or the levels and the wall line, and mark clearly what is fixed and what can still move. A drawing that states its assumptions can be approved conditionally; one that hides them turns into a change order when the paving is laid.

If the terrace is still being designed, it is worth settling the post positions first, because everything else — paving joints, drainage falls, planting, lighting — is easier to arrange around four points than around a finished slab.

Related notes

Working on a project? Send a drawing and we reply from the Foshan plant with a first price. Not sure which line fits — start from the six product lines.